Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 16 results ...

Bambrick, B (1994) Construction of an Island. Journal of Construction Engineering and Management, 120(01), 223–7.

Gordon, C M (1994) Choosing Appropriate Construction Contracting Method. Journal of Construction Engineering and Management, 120(01), 196–210.

Grimm, C T (1994) Void Mortar Joints: Bane of Brick Masonry. Journal of Construction Engineering and Management, 120(01), 152–61.

Halligan, D W, Demsetz, L A, Brown, J D and Pace, C B (1994) Action‐Response Model and Loss of Productivity in Construction. Journal of Construction Engineering and Management, 120(01), 47–64.

Ledbetter, W B (1994) Quality Performance on Successful Project. Journal of Construction Engineering and Management, 120(01), 34–46.

Oloufa, A A, Eltahan, A A and Papacostas, C S (1994) Integrated GIS for Construction Site Investigation. Journal of Construction Engineering and Management, 120(01), 211–22.

Riad, N I, Arditi, D and Mohammadi, J (1994) Integrated System for Managing Owner‐Directed Project Acceleration. Journal of Construction Engineering and Management, 120(01), 77–95.

Russell, A D and Fayek, A (1994) Automated Corrective Action Selection Assistant. Journal of Construction Engineering and Management, 120(01), 11–33.

Russell, J S, Gugel, J G and Radtke, M W (1994) Comparative Analysis of Three Constructability Approaches. Journal of Construction Engineering and Management, 120(01), 180–95.

Rwelamila, P D (1994) Group Dynamics and Construction Project Manager. Journal of Construction Engineering and Management, 120(01), 3–10.

Tanwani, R and Iseley, D T (1994) Tracking and Steering Systems in Trenchless Construction. Journal of Construction Engineering and Management, 120(01), 65–76.

Teicholz, P and Fischer, M (1994) Strategy for Computer Integrated Construction Technology. Journal of Construction Engineering and Management, 120(01), 117–31.

Thabet, W Y and Beliveau, Y J (1994) Modeling Work Space to Schedule Repetitive Floors in Multistory Buildings. Journal of Construction Engineering and Management, 120(01), 96–116.

Thomas, H R and Sakarcan, A S (1994) Forecasting Labor Productivity Using Factor Model. Journal of Construction Engineering and Management, 120(01), 228–39.

Warszawski, A and Rosenfeld, Y (1994) Robot for Interior‐Finishing Works in Building: Feasibility Analysis. Journal of Construction Engineering and Management, 120(01), 132–51.

Wu, R W and Hadipriono, F C (1994) Fuzzy Modus Ponens Deduction Technique for Construction Scheduling. Journal of Construction Engineering and Management, 120(01), 162–79.